UPS Maintenance

Scheduled Maintenance Report for Namesco Limited

Completed

This maintenance has been cancelled.

The identified part was incorrect and is a less significant fan than originally expected and was one the engineer was not carrying. This maintenance will be rescheduled for a later date.
Posted Apr 30, 2019 - 14:41 BST

Update

Scheduled maintenance is still in progress. We will provide updates as necessary.
Posted Apr 30, 2019 - 14:40 BST

In progress

Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Apr 30, 2019 - 13:10 BST

Scheduled

During preventative maintenance checks we have determined that there has been a fan failure on one of our UPS units, during this period, load will be transitioned via STS to replace the defective part.

We do not expect this to be service affecting, however it should be considered "at-risk" as there will be reduced resiliency at some points during the window for a portion of our data centre.
Posted Apr 30, 2019 - 13:06 BST